I usually save the humor until Friday, but Crispin (Kik) Piney sent me a copy of his Project Management Immaturity Model which lists the maturity levels that other models such as CMMI and OPM3 leave out. Read it and learn how the familiar 5 levels:
5: optimising
4: managed
3: defined
2: repeatable
1: initial
are extended into a full nine levels with the addition of:
0: incompetent
-1: obstructive
-2: antagonistic
-3: psychotic
Comments (1)
thank u
Posted by getu | May 30, 2008 7:28 AM
Posted on May 30, 2008 07:28